Statement showing MP-Wise fund receive and expenditure

during 2002-03,2003-04,2004-05 and 2005-06under MPLAD Scheme

 

Name of MP:- Sri Khagen Das (LS)

                                                            (2002-03)                                                     (Rs.in lakhs)

I / Os

SlNo.

Name of the project

Fund received 

Expenditure incurrd

Status

1

2

3

4

5

6

 EO,
UDP  N/P

1

Constn. of drain from the house of Shri Shankar Mahajan to Gumati River(W/ No.1) and from the house of Shri Bikram Saha to Shri Santi Saha’s residence(W/ No.2).

1.50

1.50

 ‘C’

- Do -

2

Constn. of road from the house of Shri Haripada Bhowmik to Shri Sajal Majumdar including ground wall(W/ No.8)

0.75

0.75

 ‘C’

- Do -

3

Constn. of drain behind Tele-communication office at Ful Kumari(W/ No.5).

0.31

0.31

‘C’

- Do -

4

Constn. of Class Room for Hariananda Girls H.S.School,UDP

5.00

5.00

 ‘C’

EE,

PWD,STB

-

Addl. Fund for constn. of Cultural Hall at Birchandra Manu,Belonia.

5.07

5.07

‘C’

EE(RD),

SOUTH

5.

Constn of school building for Bivekananda Vidhyapith,UDP.

10.00

10.00

‘C’

BDO, KBN

-

Addl. constn. of Community Hall at Kakraban, Udaipur

8.25

8.25

‘C’

BDO, BGF

6.

*

Constn.of building at Dronajoy Choudhury Para High School, Belonia

5.00

5.00

‘C’

- Do -

7.

Const. of Community Hall at Baikhora, Belonia

18.33

18.33

‘C’

- Do -

8

Constn.of building at Sonartilla High School, Belonia

4.00

4.00

‘C’

- Do-

9.

 

Constn. of building at Brintak Siksha Niketan, Baikhora Belonia

5.00

5.00

‘C’

EO, BLN N/P

10.

Constn.of market stall at Belonia No. 1 Tilla market

10.00

10.00

‘C’

BDO, RJN

11.

Constn.of Ekinpur High School, Belonia

5.00

5.00

‘C’

- Do -

12.

Constn.of Krishnanagar J.B. School, Niharnagar G/P, RJN

2.35

2.35

‘C’

- Do -

-

Addl. fund for completion of 300 Seated Community Hall at Barpathari , Belonia

8.25

8.25

‘C’

BDO , KBN

-

Addl. fund for construction of Mirza H/S School

2.00

2.00

‘C’

- Do -

13.

Addl. fund for construction of Ganga Cherra High School

2.00

2.00

‘C’

 - Do -

14.

  *

Const. of 300 seated Community Hall at Mirza, Udaipur

8.25

8.25

         ‘C’

BDO, MTB

15.

Addl. fund for construction of boundary wall for State ( Boys) , Khilpara, Udaipur

0.40

0.40

‘C’

- Do -

16.

Constn.of additional class rooms for Hirapur High School, Udaipur

7.50

7.50

‘C’

TOTAL :

 

 

108.96

108.06

 

                       ( 2003  - 2004  )

BDO, BGF

-

Addl. fund for construction of Drunajoy Para High School under Belonia.

0.32

0.32

‘C’

- Do -

-

Addl. fund for construction of Sonartilla High School , Belonia

4.50

4.50

‘C’

BDO, BGF

-

Addl fund for construction of Chandra Nath Choudhury Para High School, Belonia

0.50

0.50

‘C’

- Do -

-

Addl. fund for construction of Brintak Siksha Niketan, Baikhora, Belonia

3.00

3.00

‘C’

BDO , RJN

1.

Constn. of East Kalabaria High School , Rajnagar

10.00

10.00

       ‘C’

(1)

 

 

1

2

3

4

5

6

BDO, MTB

2.

Constn. of Community Hall at Garjee, Udaipur

8.25

8.25

‘C’

BDO, KILLA

3.

*

Const. of building for Tairupa Bari High School, Udaipur

7.50

7.50

‘C’

- Do -

4.

*

Constn. of building for Raiya Bari High School, Udaipur

7.50

7.50

     ‘C’

TOTAL

 

 

41.57

41.57

 

(2004-2005)

E.O

BLN  N/p

-

Additional fund for construction of Indoor Sports Complex at BKI School,Belonia

15.00

15.00

‘C’

BDO,

RJN.

1.

Construction of Market Stall at Paikhola Bazar, Belonia.

5.00

5.00

‘C’

-Do-

2.

Construction of Class rooms at Manurmukh High School, Belonia.

5.00

5.00

‘C’

    BDO,

Killa

3.

Construction of Debtamura High School, Udaipur.

5.50

5.50

‘C’

-

Additional fund for construction of building for Tairupabari High School, Killa, Udaipur.

0.76

0.76

‘C’

-

Additional fund for construction of building for Raiabari High School, Killa, 

0.76

0.76

‘C’

4.

Construction of School building at Jelemabari High School.

5.00

5.00

‘C’

BDO,

RJN

-

Additional fund for construction of building in South Bharat chandra nagar high school,BJN, Belonia

0.56

0.56

‘C’

-Do-

-

Additional fund for construction of 300 seated community Hall at Barpathari, RJN Block, Belonia

0.35

0.35

       ‘C’

-Do-

-

Additional fund for construction of building in Baganbari High School, RJN, Belonia.

1.33

1.33

‘C’

-Do-

5.

Construction of building at Gabtali High School under Indranagar G.P, Rajnagar Block.

7.50

5.82

Work completed up to lintel level

BDO,

KBN

6.

Construction of School building at Palatana High School.

5.00

5.00

‘C’

-

Additional fund for construction of 300 seated Community Hall at Mirza.

10.00

10.00

‘C’

EE, RDD,

South

7.

Construction of class room at Netaji Subhas college, udaipur.

7.50

2.42

Work in progress

 

 

TOTAL:

69.26

 62.50

 

 

(2005-2006)

EO,N/P, UDP

1

Electrification of Rajarbag and Sunamura panchyat, Udaipur town .

4.00

4.00

‘C’

2

Construction of drain from Netaji chowmohani to Gumati river at Chanban. (Ward –2)

1.00

0.56

‘C’

3

Construction of Box culvert near Hariananda Girls H/S School at Giridharipalli. (Ward-2)

0.25

0.15

‘C’

4

Construction of drain from easr R.K.Pur J/B School to drop gate (Dhanya Manikya Road ) (Ward-4)

1.50

1.02

          ‘C’

5

Const. Of drain from backside of fire service to Madhya Para (Ward-6)

1.00

0.72

Progress  60%

6.,

Construction of drain from the house of Haripada Gowsami to the house of Narayan Goswami at Madhya Plara (Ward-7)

1.0

0.60

   Progress  60%

7.

Construction of drain at Shibbari Road (Ward-3)

1.00

0

Not started

8.

Construction of drain from the house of Kalachan Saha to the house of Dipak Dey via Krishna Saha at Fulkumari (Ward-5)

1.00

0.62

‘C’

 

 

(2)

 

1

2

3

4

 

6

EO,N/P, UDP

9.

Brick soling of road from the house of Dilip Debnath to Maragang at Khudiram palli, Town Razarbagh (Ward-8)

0.50

0.32

Progress 30%

10.

Brick soling of road from Anandalaya to Chhanban Balwadi Centre via Vollyball Ground (Ward-9)

0.25

0.18

Progress 30%

11.

Brick soling of road from the house of Bireswar Ganguly to Gomati river near Lyouth Club at Razarbagh (Ward-9)

0.75

0.49

‘C’

12.

Const. Of 4 Nos box culvert in the backside of Razarbagh Motor Stand, Razarbagh Panchayat

1.00

0.56

‘C’

13.

Brick soling of road from National Highway (residence of Babul Paul) to the house of Keshab Roy via lhouse of Brajalal Das, Razarbagh

0.75

0.24

‘C’

14.

Brick soling of road from National Highway,(opposite of Fulkumari telephone tower) to the house of Haradhan Majumder, sonamura.

0.75

0.52

Progress40%

 

 

 Total :-

14.75

9.98

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 (3)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Statement showing MP-Wise fund receive and expenditure

during 2002-03,2003-04,2004-05 and 2005-06under MPLAD Scheme

 

Name of MP:- Sri Bajuban Riyan (LS)

                                    (2002-03)                                                                    (Rs.in lakhs)

I / Os

SlNo.

Name of the project

Fund received 

Expenditure incurrd

Status

1

2

3

4

5

6

BDO,

STC

1.

Constn. of building in Jalefa High School,Sabroom.

8.00

8.00

‘C’

-Do-

2.

Constn. of building in Brajendra-

Nagar High School,Sabroom.

10.00

10.00

‘C’

-Do-

-

For completion af 300 seated Community Hall at Kalacherra, SBM

8.25

8.25

‘C’

-Do-

3.

Installation of street light system from Manu community Hospital to Manu H.S School gate at Manu Bazar, Sabroom.

2.00

2.00

‘C’

BDO,

STC

4.

Constn of Road from Uttar Kaladhepa to Bairab Dewan Para Under Kaladhepa G/P (formation & Brick soling)

3.00

3.00

‘C’

BDO,

HRM

-

Completion of constn of 4 Nos. of class rooms in HRM H/S school.

5.00

5.00

‘C’

-Do-

-

For completion of constn of Addl. building for class room in Matai H/S school under Belonia.

5.00

5.00

‘C’

-Do-

5.

Constn of market stall at Manirambari market, Belonia.

3.00

3.00

‘C’

 BDO,

AMP

-

For completion of 300 seated Community Hall at Natunbazar, Amarpur

8.25

8.25

‘C’

BDO,

BGF

-

For completion of 300 seated community Hall at Julaibari,BLN

8.25

8.25

‘C’

BDO,

KBK

6.

Constn. of Foot Bridge over Chelagang Cherra at Chelagang,Amarpur.

5.00

5.00

‘C’

BDO,

OMPI

7.

Constn. of building at Tentaibari High School, Amarpur.

8.00

8.00

‘C’

-Do-

8.

Constn. of Labour Room at Ompi Rural Hospital, Amarpur.

5.00

5.00

‘C’

BDO,

AMP.

-

Const.of steel foot bridge over Sonagangcherra, Amarpur

     8.21

    8.21

‘C’

EE

(TTAADC)

BCM

-

Constn of PHC at Karbook,AMP

     5.62

    5.62

‘C’

EE(RD),

South

-

Constn of Steel foot Bridge over potacharra at Sindukpathar,STC.

     2.26

    2.26

‘C’

TOTAL :

 

 

94.84

94.84

 

(  2003-2004  )

BDO,

STC

1.

Constn. of Foot Bridge at Bhoratali Cherra near No.1 Satchand S.B. School, SBM.

5.00

5.00

‘C’

-Do-

2.

Installation of 4 nos. of Sub-Mersible Pump for irrigation purpose at Kaladepa, SBM.

3.00

3.00

‘C’

-Do-

-

Constn. of 300 Seated Community Hall at Kalacherra, Sabroom.(Addl.)

6.75

6.75

‘C’

- Do -

3.

Installation of 3 Nos sub mersible pump for irrigation  purpose at Gardhang , Sabroom .

1.82

1.82

‘C’

 BDO,

AMP

4.

Constn. of building at Sonacherra TMC High School, Amarpur.

8.00

8.00

‘C’

 -Do -

 

-

Constn. of Steel Foot Bridge over Sonagangcherra, Amarpur.(Addl.)

5.63

5.63

‘C’

 

(4)

 

1

2

3

4

5

6

BDO,

OMPI

5.

Constn. of building at Palkubari S.B.School, Amarpur.

5.00

5.00

‘C’

BDO,

 RPC

6.

 *

Const.of foot bridge over river Manu at Hazari Para, East Manubankul, Sabroom

5.00

5.00

‘C’

TOTAL

 

 

40.20

 40.20

 

(2004-2005)

BDO,

BGF

 

-

Addl. fund for completion of building in Paschim pillak High School, Bagafa, Belonia Sub-division

0.50

0.50

‘C’

1.

 *

Construction of 300 seated Community Hall at Muhuripur under Belonia Sub-Division.

10.00

10.00

Work in progress up to plinth level

BDO,

STC

-

Addl. fund for development of playground at Gardhang H.S.School under Satchand, Sabroom Sub-division.

4.00

4.00

‘C’

BDO,

KBK

-

Addl. fund for completion of building in Basi chandra para High School , karbook Block under Amarpur Sub-Division.

1.82

1.82

‘C’

BDO,

RPC

-

Addl. fund for completion of Foot bridge over river Manu at Hajarai Para, East Manubankul, Sabroom.

3.72

3.72

‘C’

EE,TTAADC, BCM

-

Addl. fund for completion of Karbook PHC under Amarpur Sub-Division.

1.21

1.21

‘C’

EE,TTAADC,BCM

2.

 Construction market Stall at Debdaru Market under Belonia Sub-Division.

3.00

3.00

‘C’

 EE,RDD

(South)

-

Addl. fund for completion of steel foot bridge, Potacharra at Sindhukpathar at satchand Block.

0.38

0.38

‘C’

BDO,

AMP

-

Addl. fund for completion of 300 seated Community Hall at Natunbazar under Amarpur Sub-Division.

1.26

1.26

‘C’

EE,PHE,

Div-VII,

Belonia

3.

Sinking of Deep Tube Well at Hitchacherra Tea Estate under Belonia Sub-Division.

10.00

7.48

Sinking completed

 

 

TOTAL

35.89

 33.37

 

(2005-2006)

BDO, STC

1

Development of Madhabnagar market, Madhabnagar G/P, Satchand Block under Sabroom Sub-Division.

4.00

4.00

           ‘C’

2

Constn. Of 300 seated community hall at Chhotakhil under STC Block, Sabroom.

10.00

5.02

Material booked

3

Constn. Of 300 seated community hall at Manubazar under STC Block, Sabroom.

10.00

6.79

Work in progress

4

Development of Satchand Bazar under STC Block, Sabroom

5.00

2.88

Foundation work completed

5

Installation of 4 Nos. of Sub-mergible pump for irrigation purpose at gardhang under STC Block, Sabroom.

3.00

2.85

         ‘C’

EO,N/P, SBM

6

Development of Sabroom market at Sabroom Town, Sabroom N/P under Sabroom.

5.00

3.27

Completed up to lintel level

BDO, RPC

7

Development of South  Manubankul market under RPC Block, Sabroom.

5.00

2.53

         ‘C’

8

Constn of Boarding house at Baishnabpur High School under RPC Block, Sabroom.

5.00

5.00

Above lintel level

BDO, HRM

9

Constn. Of Market stall at North Sonaichari Market under HRM Block, Belonia.

4.00

2.80

          ‘C’

10

Constn. Of Market stall at Ratanpur Market under HRM Block, Belonia.

4.00

2.51

75% completed

BDO, Amarpur

-

Additional fund for construction of 300 seated community hall at Natunbazar, Amarpur.

0.70

0.70

           ‘C’

 

 

(5)

 

 

 

1

2

3

4

5

6

BDO, BGF

11

Constn. Of additional  building for Julaibari PHC, Bagafa Block, Belonia.

8.00

2.12

Work in progress

12

Constn. Fo 20 Nos. Market stall at Kwaifung market, Bagafa Block , Belonia.

15.00

15.00

           ‘C’

-

Additional fund for completion of the construction of 300 seated community hall at Muharipur G/P , Belonia.

13.46

8.01

Progress up to plinth level

EE,RDD, South

13

Constn. of Foot bridge over Manu river at Barkhola, Bijoynagar G/P under STC Block, Sabroom.

5.00

5.00

Work in progress

EO, N/P, Amarpur

14

Constn. of side wall & hcightening of road from Sat Sangha Ashram to the Birbal Das Para, Amarpur.

2.00

2.00

          ‘C’

 

15

Constn.of side wall & Box culvert in the road from Khudhiram palli rice Mill to the road leading to the Narendra Das, Amarpur.

2.00

0

Work started

 

16.

Constn. Of boundary wall for Kolabag JB School, Amarpur.

1.00

0.07

Work in progress

 

17

Constn. Of Mini community hall at Town Rang kang, Amarpur Town, Amarpur.

1.00

0.08

Work started

 

18

Constn. Of Mini community hall at Vivekananda palli, Amarpur Town, Amarpur.

1.00

0

Work started

 

19

Constn. Of pucca drain on the road from the house of Bipad saha to the house of Dulal Karmaker, Amarpur.

0.50

0.05

10% Progress

 

20

Constn. Of pucca drain from the Sukumar colony Balwary School to the stream, Amarpur.

0.50

0.04

4% Progress

 

21

Constn. Of pucca drain on the road from the house of Mantu saha to the Rajkang stream via Haripada Dey’s house, Amarpur.

0.70

0.70

         ‘C’

 

22

Constn. Of pucca drain on the road from the house of Manuharan saha to the Manindra Paul’s house,Amarpur.

2.00

1.26

           ‘C’

 

 

                        TOTAL :-

107.86

72.68

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(6)

 

 

 

 

 

 

 

 

 

Statement showing MP-Wise fund receive and expenditure

during 2002-03,2003-04,2004-05 and 2005-06under MPLAD Scheme

 

Name of MP:- Sri Matilal Sarker (RS)

                                    (2002-03)                                                                    (Rs.in lakhs)

I / Os

SlNo.

Name of the project

Fund received 

Expenditure incurrd

Status

1

2

3

4

5

6

BDO,

OMPI

-

Addl. fund for constn. Of Community Hall at Ompi, Aamarpur

8.25

8.25

‘C’

- Do -

1.

Constn of addl. building at Taidu PHC, Amarpur

3.00

2.00

5.00

‘C’

BDO,

MTB

-

Addl fund for constn. Of Community Hall at Bagma, Udaipur

10.75

10.75

‘C’

- Do -

2. *

Constn of 300 seated Community Hall at Matabari , Udaipur

5.00

5.00

‘C’

BDO,AMP

3.

*

Constn. Of Children Park at Natunbazar, Amarpur

3.00

3.00

‘C’

BDO,RJN

4.

Constn of building at Rangamura Homeo Dispensary, Belonia

5.00

5.00

‘C’

BDO,STC

5.

Constn. Of building for Manu Tahashil High School, SBM

8.00

8.00

‘C’

- Do -

6.

Constn. Of building for Amlighat Medical sub centre, Sabroom

4.00

4.00

‘C’

- Do -

7. *

Constn. Of building for Samarendragang High School under STC block, SBM

4.00

4.00

‘C’

- Do -

8.

Constn. Of Mukta Mancha for cultural activities at Sabroom town under STC block

3.00

3.00

‘C’

BDO,RPC,

9.

Constn. Of shed at Suknachari market, Sabroom

5.00

5.00

‘C’

- Do -

10.*

Constn. Of building for Manubankul H/S School under RPC block, Sabroom

5.00

5.00

‘C’

BDO,KILLA

11.*

Constn. Of 300 seated Community Hall at Killa, Udaipur.

5.00

5.00

‘C’

BDO,BGF

12.

*

Constn of Campus hall for Bagafa Ashram H.S.School. BGF

5.00

5.00

‘C’

TOTAL

 

 

76.00

76.00

 

                                                                            (  2003 – 2004  )

 E.O, BLN N/P

1

Constn. Of Kalinagar Motor Stand market stall, Belonia

4.00

 

     4.00

 

8.00

‘C’

EE,PWD,Div-II,

STB

2.

*

Constn. Of Belonia Vidhyapith H/S School.

5.00

5.00

 

10.00

‘C’

BDO,

KILLA

-

Balance fund for constn. Of Community Hall at Killa, Diaper

5.00

5.00

‘C’

BDO,

MTB

-

Balance addl. Fund for constn. Of Community Hall at Matabari, Diaper

13.25

13.25

‘C’

- Do -

3.

*

Constn. Of building at Murapara High School, Diaper

5.00

5.00

‘C’

 

BDO,

BGF

4.

*

Constn. Of playground at Jolaibari H/S School

3.00

3.00

‘C’

 BDO,

RPC

-

Balance fund for constn. Of building for Manubankul H/S School under RPC block, Sabroom

5.00

5.00

‘C’

BDO,

STC

-

Balance fund for constn of building for Samarendragang High School under STC block, Sabroom.

4.00

4.00

‘C’

BDO,

KBN

5.

*

Constn of building at Dud Puskarini High School, Diaper

5.00

5.00

‘C’

EO,

SBM N/P

6.

*

Constn. Of Cultural Hall at Sabroom H/S school

3.00

3.00

‘C’

TOTAL

 

 

61.25

61.25

 

                                                                            (7)

 

                                                                     (  2004 – 2005  )

1

2

3

4

 5

6

B.D.O.

Amarpur

-

Balance fund for construction of Children’s Park at Natunbazar

2.00

 

2.00

‘C’

B.D.O.

Bagafa

-

Balance fund for construction of Playground at Jolaibari H/S School.

2.00

2.00

‘C’

B.D.O.

Kakraban

-

Balance fund for construction of  building of Dudh Puskarini High School.

3.00

3.00

‘C’

E/O.

SBM,N/P

-

Balance fund for construction of Cultural Hall at Sabroom Higher Secondary School.

3.00

3.00

‘C’

BDO,

BGF

-

Additional fund for construction of Campus Hall at Bagafa Ashram H/S School,Belonia.

5.00

5.00

‘C’

BDO,

BGF

1.

Construction of market Stall at Debdaru Bazar, Belonia.

2.50

 

1.50

4.00

‘C’

BDO,

MTB

2.

Construction of class rooms at Paoramura High School, Udaipur

2.50

2.50

5.00

‘C’

-

Addl. Fund for construction of Murapara high School,udaipur

3.00

3.00

‘C’

BDO,

Killa

-

Additional fund for construction of Community Hall at Killa, Diaper.

8.25

8.25

‘C’

BDO,

STC

3.

Construction of Class rooms at Gardhang H/S School, Sabroom.

4.00

 

3.00

6.30

Roofing completed

EE, PWD,

Div-II,

Santibazar

-

Additional fund for construction of Belonoa Vidyapith H/S School.

5.00

0

Completed up to roof level.

 

 

TOTAL

47.25

 41.55

 

(2005-2006)

1

2

3

 4

 

6

Eo,N/P,

Amarpur

1

Construction of pucca drain from the house of Biplab Roy to Pucca road(105mtr.)

1.40

1.38

‘C’

2

Construction of pucca drain from  Bhupati Sarker’s house to Bidhu Pal’s house(170mtr.)

2.52

2..34

‘C’

3

Construction of pucca drain from Sankar palli pump house to Anil Debnath’s house(210 mtr.)

2.30

2.25

‘C’

4

Construction of pucca drain from the house of Gopinath Sutradhar to the house of Birbal Das (160 mtr.)

2.30

1.38

Progress 48%

5

Construction of drain from Pran Gopal Das’s house to Suresh Debnath’s house(250 mtr.)

2.60

2.50

‘C’

6

Construction of pucca drain from Shibu Saha’s house to Babul Das’s house (175 mtr.)

1.80

0.95

‘C’

EE,PWD, Div-II, STB

-

Additional fund for construction of Belonia Vidhyapith H/S School, Belonia.

5.00

0

Completed up to roof level

EE,RDD, UDP (S)

-

Additional fund for construction of Abhoynagar H/S School, Belonia.

0.37

0.37

‘C’

 

 

 TOTAL :-

18.29

11.17

 

 

 

 

 

 

 

(8)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

List of Reconciliation of MPLADS fund

Which received by DM & Collector, South Tripura

                                                                (  Sri Khagen Das, MP  , LS )

                                                                                              

      ( Rs. In lakhs)

 

Sl. No

Year

            Fund placed with Nos. & Date

No. of projects for which fund was

Remarks

Amount

No.

Date

New

On going

1

1995-96

15.00

F.6(3)FIN(B)/95/CSS/41/86

15.9.95

12

 

 

2

195-96

11.00

F.10(26)DWD/SMD/95-6/7095-98

20.11.95

3

 

 

 

Total

26.00

 

 

15

 

 

1

1996-97

36.10

F.10(26)DWD/BC/96-97/820-22

1.3.97

10

 

 

 

Total

36.10

 

 

10

 

 

1.

1998-99

10.00

F.10(26)DWD/SC/98-99/1970-72

19.4.99

1

 

 

2

1998-99

10.00

F.10(26)DWD/SC/2000/3006

30.6.2k

1

 

 

3

1998-99

8.00

F.10(26)DWD/SC/98-99/1225-27

27.2.99

2

 

 

4

1998-99

10.00

F.10(26)DWD/SC/98-99/4134-36

25.10.99

2

 

 

 

Total

38.00

 

 

6

 

 

1

1999-2k

24.46

F.10(26)DWD/SC/98-99/1551-53

18.3.2k

2

 

 

2

1999-2k

12.00

F.10(26)DWD/SC/98-99/1875-77

28.3.2k

2

 

 

 

Total

36.46

 

 

4

 

 

1

2000-01

88.62

F.10(26)DWD/SC/2k-01/3478-80

16.8.2k

13