DISTRICT
LEVEL TRIBAL WELFARE REVIEW MEETING UNDER THE CHAIRMANSHIP OF HON’BLE
MINISTER TRIBAL WELFARE ON 30.4.2005 IN UDAIPUR CIRCUIT HOUSE. |
Highlights
of the discussion held in the meeting are reflected below:
|
Points |
Observation |
|
Point No.1 - All the JB Schools in TTAADC area, which
do not have any pucca building at present, would be provided with pucca buildings
by the year 2006-07 |
a)
Dy. Director, Education should complete all the on goings SSA works
sanctioned in the financial year 2003-04 within May, 2005. b)
All Schools without pucca school building should covered under
SSA/SGRY/PMGY/NLCPR in the financial year 2005-06. |
|
Point No.2-Furniture will
be supplied to the JB schools in TTAADC areas in a phased manner and teaching
aids will be supplied to all the JB Schools in TTAADC areas, which are not
presently supplied with teaching aids. |
Dy.
Director, Education shall furnish compiled information of number of schools
requiring additional furniture. Reports submitted by TTAADC shall also taken
into consideration while preparing consolidated report of the district
Requirement of fund may be met out of SSA funds, if permitted by the
Education Department in the State Government. Dy. Director Education may send
a proposal in this regard. |
|
Point No.3- Drop out ration
for Scheduled Tribes students in general and girl students in particular at
Madhyamik state will be brought down by at least 10% from the existing level. |
Dy.
Director Education informed that there are 9405 unenrolled children in TTAADC
areas. The drop out rate from Class-I to Class-V is 19% and 31% from Class-VI
to Class-VIII. Efforts shall be made to target all the identified
unenrolled children. |
|
Point No.4- Science stream
at the Higher Secondary level in the Higher Secondary Schools in TTAADC areas
will be started in minimum 10 Schools as under 2004-05- 3 School, 2005-06-3
schools and 2006-07-4 schools |
a)
Dy. Director, Education shall pursue the matter with Education Deptt. for
commencement of Science stream in Ompi and Bankul Class-XII School. b)
The proposal sent earlier regarding Gamaria, Birchandra Sahid Smriti and
Gardhang Class-XII School should also be pursued. |
|
Point No.5 All the Junior
Basic Schools in TTAADC areas not having safe drinking water source and
sanitation facilities will be provided with water and sanitation facilities. |
a)
It was reported by RD that in 2003-04, 111 nos JB Schools have been covered
for safe drinking water sources under PMGY(DW), SSA & PM’s announcement.
In 2204-05- PM’s announcement total 95 schools taken up for providing
drinking water facility under the scheme. Total 53 schools completed and 42
in progress. 22 JB Schools covered by sanitation facilities during 2004-05. b)
All BDOs were requested to evolve a mechanism/proper upkeep of drinking water
sources in school in ADC areas. c)
Dy. Director Education should endeavour to build a sense of responsibility
and belongingness amongst the students and teachers for proper upkeep of the
drinking water sources. |
|
Point No.6- Two more
Residential Schools for tribal students would be sent up in Sabroom and
Khowai Sub-Divisions to offer high standard of education and these schools
would be managed by the Tribal Tribal Welfare Residential School Society
under the TW Department. |
Foundation
stone has been laid on 10.1.2005 in EMRS at Bhuratali, Sabroom. Expenditure
sanction for Rs. 25.00 lakh received and placed with EE RD. Work order issued
and RD materials booked. |
|
Point No.7 - Coaching for
Joint Entrance Examination will be conducted in all District. |
Performance
of the Joint Entrance coaching centre should evaluated by DTWO. For next
financial year, advance steps should be taken for submitting proposal for JEE
Coaching Centre so that the Centre is opened in time and the duration of
imparting coaching is not less than 6 months |
|
Point No.8- One new ITI
shall be opened at Ambassa and the ITI at Jatanbari shall be upgraded |
a) SE, PWD assured that the tender
will be called within 7(seven) days of receipt of Plan and detailed drawings
from Chief Engineer’s Office. b)
Efforts shall be made to commence the construction work of ITI before Puja
vacation. |
|
Point No.9- Posting of
adequate number of teachers in all schools in ADC areas will be given
priority. |
a)
A detailed exercise shall be carried out by Dy. Director, Education for both,
ADC and non ADC schools regarding the availability of teachers in each
school. b)
Based on the students & teachers ratio, a proposal shall be sent to
Education Department for transfer of teachers from surplus to deficit schools. c)
All SDMs shall be furnished the information on basic details of
ADC Schools in prescribed proforma as
circulated in the meeting. |
|
Point No.10- Literacy
campaign will be activated as a major thrust area for achieving cent percent
literacy among tribal. |
Special
drive shall be taken up by Social Welfare Department for covering all the
left over ST learners. |
|
Points |
Observation |
|||||||||
|
Point No.11 Const. of
buildings for Health Institutions (PHCs and Sub-Centre) located in tribal
areas will be given priority. Health Deptt. Shall taken up construction of
buildings for 10 Institutions each year. |
a)
As per report of SDM, Belonia, the MPW posted in Takmachara and Debipur
Sub-Centres are not performing their duties regularly. CMO, South shall
ensure that there is a regular MPW in these Sub-Centres. b)
Proposal shall be sent by CMO for carrying out major repair and renovation of
Tairupabari (Belonia Sub-Division) Sub-Centre and Kalachara PHC
(Sabroom Sub-Division). |
|||||||||
|
Point No.12- At least 5
local tribal women in each village the TTAADC area shall be given Dhai
training for ensuring safe deliveries. |
So
far only 145 women have been covered under Dhai training in TTAADC areas. For
achieving the target, at least 400 women should be covered in this financial
year. CMO, South may prepare a proposal for placement of fund for Dhai
Training in PGP areas. This proposal should be submitted to Director,
PGP & Director, Tribal Welfare. |
|||||||||
|
Point No.13- Immunization
will be taken up in tribal areas in a big way to achieve 100 percent coverage
among the children and pregnant mothers. |
a)
Immunization programme should continue even in those Blocks where hundred
percent target is claimed to be achieved as, the target of immunization could
not be static. Revised target should be fixed after ever six months taking
into account the population of target group. b)
Special review shall be conducted by CMO for monitoring the immunization
programme in difficult Blocks viz Killa, Ompi and Karbook Blocks. |
|||||||||
|
Point No.14- All the 291
Partially Covered Habitation (P.C. Paras) as on 01/04/2003 in tribal areas
will be upgraded to Fully Covered Habitations (F.C. Paras) by providing
additional sources of drinking water. |
Coverage of NC/PC
habitation in Tribal areas during 2004-05 |
|||||||||
|
Status or NC/PC habi. In
tribal areas after resurvey of DW |
Taken up during 04-05 |
Converted to FC during
04-05 |
Action Plan for 2005-06 |
|||||||
|
NC |
PC |
|||||||||
|
NC |
PC |
NC |
PC |
Conv |
Pro. |
Conv. |
Pro. |
NC |
PC |
|
|
215 |
227 |
125 |
31 |
73 |
52 |
11 |
20 |
90 |
196 |
|
|
Point No.15- Minimum 40% of
new Pipe water supply schemes/Iron Removal Plants shall be taken up in tribal
areas. |
a)
Minimum 40% of new PHE schemes and IRPs should be installed in ADC areas. b)
The list of NC & PC paras furnished by BDOs shall be taken into
consideration before finalizing the Action Plan under ARWSP and other DW
schemes being implemented by PHE Department. Efforts shall be made to
diversify from the existing pattern of taking-up only deep tube wells in
relatively plain and comfortable areas. Innovative schemes may be
evolving for tapping surface area in highly and difficult areas. |
|||||||||
|
Point No.16- Area Based
integrated projects shall be taken up in minimum 10 identified tribal villages
to accelerate growth. |
a)
All Department should monitor the activities being taken up in the Special
Area Based Projects. Besides, implementing the schemes identified by TW
Department, each department should short list and prioritise activities to be
taken up in Area Based Project. These activities should be implemented under
budgetary support of the concerned department. b) Monthly report on the physical
and financial achievement of activities being taken up in Area Based Project
should be sent to the concerned SDM by field level office of each department. c) Displeasure was expressed on the poor performance of PWD &
Power Departments in Area Based Projects. |
|||||||||
|
Point No.17- At least 5,000
hectares of irrigation potential would be created in tribal areas through the
Minor Irrigation Schemes during the next 4 years. |
a)
Minimum 40% of the scheme should be taken up in the ADC areas in the current
financial year. The old schemes should be revised by carrying out minor/major
repairs, as the case may be so that more area is brought under irrigation. b)
In current financial year, minimum 500 Ha. should be brought under irrigation
in ADC areas by IFM Department. |
|||||||||
|
Point No.18- The Power
Deptt would electrify at least 300 backward tribal habitations not having
electricity at present and at least 100 habitations would be covered by
non-conventional source of power by the Science and technology Deptt. |
a)
Action taken of Power Department in covering the backward tribal habitations
was reviewed in detail. It was found that, very few number of villages
have been covered in the last financial year. b)
Efforts should be made by SE Power, Udaipur for placement of additional fund
so that minimum 50 tribal habitations are covered in the current financial
year (2005-06) under conventional sources. c)
Department of Science and Technology shall cover minimum 100 tribal
habitations under non-conventional sources in the current financial year. |
|||||||||
|
Point No.19 The Animal
resource Development infrastructure will be strengthened in Tribal Areas. |
a)
Dy. Director, ARDD shall send proposal for opening of VFAC at the following
places: Nityabazar,
South Baramura, Karbook, Atharahola, Tanani and Gamakobari. |
|||||||||
|
Point No.20- Two Commercial
handloom Production Units on loin loom shall be taken up as Pilot Projects. |
- |
|||||||||
|
Point No.21- All
habitations having at least 250 populations in rural areas will be provided
roads of improved quality by 2007 based on Core road Network Plan. |
a)
Progress of PWD in connecting the tribal habitations with 250 population by all
weather road was reviewed. Performance was not found to be satisfactory. b)
SE, PWD was requested to send a proposal to the Chief Engineer for including
selected habitations for covering under State Budget. |
|||||||||
|
Points |
Observation |
||||||||||||
|
Point No.22- At least 1500
market stalls shall be constructed for benefiting unemployed tribal youth for
self-employment |
TW Deptt under NLCPR fund |
RD Deptt under SGRY fund |
|||||||||||
|
Year |
No of stall |
No of shed |
W. Com |
90% Com |
Stall |
Shed |
W.C |
Remarks |
|||||
|
03-04 |
191 |
00 |
179 |
12 |
4 |
00 |
4 |
|
|||||
|
04-05 |
Nil |
Nil |
Nil |
Nil |
25 (T) |
20 |
15 |
11 sheds WO issued |
|||||
|
Total |
191 |
00 |
179 |
12 |
|
20 |
19 |
|
|||||
|
Point No23.- Two Cold
Storages will be constructed in tribal areas. |
Dy. Director, Agriculture
shall pursue the matter for setting up of a Cold Storage at Amarpur. |
||||||||||||
|
Point No24 - At least
15,000 tribal families would be provided dwelling houses. |
2003-04 IAY- 1,019 PMGY -385 House IAY up- gradation-
36 |
During the year 2004-05
|
|||||||||||
|
Name of scheme |
Target |
Phy ach |
In pro |
||||||||||
|
IAY house (const) |
1174 |
1174 |
00 |
||||||||||
|
IAY (upgradation) |
640 |
640 |
00 |
||||||||||
|
PMGY (GA) |
439 |
234 |
205 |
||||||||||
|
Total |
2253 |
2048 |
205 |
||||||||||
|
Point No.25- Re-grouping of
tribal villages along Highways/Road side for economic upliftment of the
tribal will be given priority and special projects shall be taken up to cover
at least 4,000 families in re-grouped clusters |
a)
The following paras will be covered under the 1st phase of
resettlement programme: Amarpur Sub-Division: Ompi – 148 families, Total
project Cost – Rs. 81.819 lakh New Dhananjoy Para – 100
families, Project cost-Rs.33.975 lakh Khuri Para- 98 families,
Project Cost Rs.52.941 Lakh Twichakma – 62 families,
Project Cost Rs. 54.329 Lakh Belonia Sub-Division: Srikantabari- 133 families,
Project Cost Rs. 378.175 lakh Charansing para- 52
families, Project Cost Rs. 313.144 lakh Sabroom Sub-Division: New Gunjalima Para- 48
families, Project Cost Rs. 14.842 lakh Kasam Para- 24 families,
Project Cost Rs. 14.93 lakh. Ghorakappa – Families
residing in the scattered habitations within 10 to 15 km of Ghorakappa would
be settled in the Khas/Govt. land near Ghorakappa. For this SDM, Sabroom may
arrange meeting of all stake holders. b)
All SDMs shall move proposal for diversion of forest land within a limit of 1
Ha for each project. c)
For infrastructural activities – Degraded forest land near the
resettled colony would be identified and proposal shall be prepared in consultation with DFO concerned for
taking up rubber plantation at the rate of 1 Ha per families. This
proposal shall be submitted by 15th May, 2005 to Tribal Welfare
Deptt. Till such time, clearance is obtained from Ministry of Environment,
Rubber Plantation shall not be taken up in the degraded forest land. |
||||||||||||
|
Point No.26- Rubber
plantation will be taken up for the benefit of the ST Jhumia families in
3,000 hectares to benefit 3,000 families to increase their income. Assistance
will also be provided to eligible ST families for taking up Tea and Coffee
plantation in potential suitable areas. |
- |
||||||||||||
|
Point No.27- Training of
Jhumias in improved farming practices will be given emphasis and at least
10,000 Jhumias will be provided |
Dy.
Director, Agriculture shall train minimum 1000 Jhumias in improved farming
practices in 2005-06. |
||||||||||||
|
Points |
Observation |
|||
|
Point No.29- Kisan Credit
Cards will be issued to eligible ST families on priority. |
a)
In the year 2003-04 – 227 ST families were provided Kisan Credit Cards. The
total achievement in the year 2004-05 is 265 ST families. b)
Target for current financial year is fixed 500 ST families. |
|||
|
Point No.30- Bamboo
cultivation conservation by tribal will be encouraged in a big way. At least
12,000 ST families will be covered for bamboo plantation to bring minimum
5,200 hectares area under bamboo cultivation in the territorial Forest
Divisions of Sadar, Teeliamura, Udaipur, Bagafa, Gumti, Ambassa, Kanchanpur
and Kailashahar. Cane and Bamboo, handicrafts activities by tribal artisans
will be promoted to involve at least 500 artisans for gainful
employment. |
a)
Emphasis shall be laid for value addition to bamboo so that the tribals
derive more benefit and returns. b)
To begin with, this value addition may cover following activities: i)
Incense stick making, ii) Handicraft items, iii) Bamboo Dhari/ Bamboo mat
& iv) Bamboo Chopsticks c) Bamboo value addition centre
would be established at the following places : i)Kowaifung, ii) Killa, iii) Atharabola, iv) Karbook & v) Silachari d)
DRDA should play a major role in covering more number of ST families under
SHGs for Bamboo Value Addition Activities. e)
Joint Forest Management Committee constituted by Forest Deptt may also be
involved under the SHG programme of DRDA. |
|||
|
Point No.31- Self Help
Groups will be formed trained and supplied with 500 pigery units (3 saw and 1
bore) and 200 goatery Units (4 goat and 1 buck) to supply improved livestock
inputs to beneficiaries under various Departments |
a)
Status report on Tribal SHG under South District (As on 31.3.05) |
|||
|
Piggery |
Goatery |
Fishery |
Total
tribal SHG |
|
|
TotalGroup-1810 |
Total
group- 350 |
Total
Group-592 |
Total
group-2752 |
|
|
1st
Gr. 236 |
1st
Gr. 49 |
1st
Gr 77 |
1st
Gr-362 |
|
|
2nd
Gr. 50 |
2nd
Gr. 30 |
2nd
Gr- 31 |
2nd
Gr- 111 |
|
|
b)
DRDA shall carry out special awareness campaigns in ADC areas for capacity
building and skill development of SHGs. c)
More number of Dal bandhu may be engaged in remote and difficult areas so
that proper inputs are given to SHGs in these areas. d)
ARDD shall take up 15 units under Special SGRY projects. |
||||
|
Point No.32- Assistance
will be given to at least 500 ST families for Pisciculture based self-
employment. |
a)
271 families have been covered under Pisciculture activities in last
financial year. b)
Dy. Director
Fisheries shall furnish list of families covered under Pisciculture to
respective BDOs. c)
300 families would be
covered under current financial year. |
|||
|
Points |
Observation |
||||||||||||
|
Point No.33- At least 1,000
Self Help Groups of tribals would be organized. Particular emphasis shall be
laid for organizing women SHGs belonging to ST under Self Help Groups. |
Statement
showing women SHG during 2003-04 (As reported by DRDA) |
Statement
showing women SHG during 2004-05 (By DRDA |
|||||||||||
|
Name
of Block |
Groups |
Members |
Groups |
Members |
|||||||||
|
Matabari Killa Kakraban Amarpur Karbook Ompi Bagafa Rajnagar Hrishyamukh Satchand Rupaichari Total
|
62 74 7 8 55 23 55 12 6 96 21 419 |
686 747 77 90 577 215 545 128 54 904 209 4232 |
1717 40 28 46 18 21 7 8 12 7 15 219 |
188 421 278 440 172 184 72 87 138 59 126 2165 |
|||||||||
|
Point No.34- Skill
Development Programmers shall be taken up to impart/upgrade skills for at
least 1,000 tribal youth for facilitating their self-employment. |
2003-04-
3 nos VTC are functioning for skill development and self emply. of
tribal youths |
2004-05
no information and fund received from TW Deptt. 3 centre closed. |
As
reported by DIC South |
||||||||||
|
Centre |
No
of trainees admitted |
No
of trainees passed |
Yr |
Tr.
(weavers) |
Achi. |
||||||||
|
Ph |
Fin |
||||||||||||
|
UDP
VTC BGF
VTC RPC
VTC Total
|
51 50 50 151 |
36 38 45 119 |
03-04 |
74
|
64 |
42385 |
|||||||
|
04-05 |
100 |
90 |
7769 |
||||||||||
|
05-06 |
100 |
|
Nil |
||||||||||
|
Point No.35-
Pre-recruitment coaching program mess for different competitive examinations
including Army, Navy and Air Force selections will be started. |
- |
||||||||||||
|
Point No.36- Documentation
of major tribal art forms shall be taken up. |
- |
||||||||||||
|
Point No.37-For Promoting
languages and literature, Directorate of Tribal Languages will be set up. |
- |
||||||||||||
2. Special Area Based
Development Programme:
All Departments were requested to give more attention
to the activities being taken up in Special Area Based Projects. A Project Officer may be appointed by each
Deptt. for this purpose. In addition to the funds earmarked by Tribal
Welfare Department, activities should be taken up ensured by the respective
departments under the normal State Plan for various activities in the Area
Based Projects.
Deputy Director ARDD, Agriculture and Fishery shall
visit all the area based projects in South Tripura District and submit proposal
to their respective Departments for allocation of fund under the identified
activities.
SE, PWD & Power were requested personally monitor
the proposal for sanction of funds submitted by field level officials. There
should a system of monthly review of the activities being taken up in Area
Based Projects by these Departments.
A meeting will be conducted by all SDMs for reviewing
the progress made by various Departments in Area Based Projects. Invariably
these meeting should be held every month and a brief report should be submitted
to Tribal Welfare Department.
Other decisions are
reflected under various Points of 37 Points Package
3.
Resettlement of Tribal Villages – The following proposal was finalized
for resettlement of tribal villages:
|
Sl No |
Name of Sub-Division |
Name of location to which
the families will be shifted. |
Total no. of families |
Proposed amount (In lakhs) |
|
1. |
Amarpur |
1. Ompi |
148 |
A. Economic activities- Total- 22.329 B. Infrastructure facilities- Total-59.490 Grand total-81.819 |
|
2. New Dhananjoy Para |
100 |
A. Economic
activities- Total- 3.975 B. Infrastructure facilities- Total-30.000 Grand total-33.975 |
||
|
3. Khuri Para |
98 |
A. Economic activities- Total-10.679 B. Infrastructure facilities- Total-42.262 Grand total-52.941 |
||
|
4. Twichakma |
- |
A. Economic activities- Total-14.729 B. Infrastructure facilities- Total-39.600 Grand total-54.329 |
||
|
Total: |
4 villages |
346 |
Grand total- 223.064 |
|
|
2. |
Belonia |
1. Srikantabari |
133 |
A. Economic activities- Total- 102.095 B. Infrastructure facilities-Total-
276.080 Grand total- 378.175 |
|
2. Charansing para |
52 |
A. Economic
activities- Total- 69.134 B. Infrastructure
facilities-Total- 244.010 Grand total- 313.144 |
||
|
Total:- |
2 villages |
185 |
Grand total-
691.319 |
|
|
3. |
Sabroom |
1. New Gunjalima Para |
48 |
A. Economic activities- Total- 7.642 B. Infrastructure facilities Total-
7.200
Grand total- 14.842 |
|
2. Kasam Para |
24 |
A. Economic activities-Total- 7.73932 B. Infrastructure facilitiesTotal-7.20000 Grand total- 14.93932 |
||
|
Total:- |
2 villages |
72 |
Grand total-
29.78132 |
|
|
4. |
Udaipur |
Nil |
Nil |
Nil |
|
Grand Total: - |
8 villages |
603 |
A. Economic
activities- Total- 238.32232 B. Infrastructure facilities-Total-
705.842 Grand total: 944.16432 |
|
In
addition to the above, additional colony would be taken up at Ghorakappa under
Sabroom Sub-Division. This would cover in remote and inaccessible falling with
10 to 15 km near Ghorakappa. The above Master Plan does not reflect the Rubber
Plantation which may be taken up after getting clearance for MoEF. SDMs were
asked to prepare plan for covering degraded forest & khas land and submit
the same to TW Deptt. The expenditure for proposed rubber plantation would be
in addition.
4. SCA & Block Grants:
The progress of
activities under SCA and Block Grants was reviewed. Instructions were issued
for completing all pending works within May, 2005. All BDOs and SDMs were
requested to send proposals under SCA & Block Grants for the current
financial year to Tribal Welfare Department. Proposal may also be sent for SCA
funds under Special Area Projects.
5. Other issues discussed in the meeting:
a) All activities in Area Based Projects shall
be through SHGs only. For this, if necessary more number of Groups may be
constituted.
b) While selecting
beneficiaries under Special Area Project, the Project Committee should
also consult BAC.
c) The performance report of existing Drop out Centres should be sent by respective SDM by July, 2005. New
proposals, if any, should also be submitted by the end of July, 2005. No
proposal shall be accepted after the cut of date.
A mechanism shall be evolved for retaining 30% of the
honorarium payable to the centre in-charge and the teachers for monitoring
the performance of drop out coaching centres. The balance amount would be
released after declaration of Madhyamik results of the students of the drop out
coaching centre. The following criteria shall be adopted for release the balance
amount:
·
If pass % is less than
50%, balance amount shall be forfeited.
·
If the pass percentage
is between 50% to 60%, 20% of the retained amount (not the total amount) shall
be released.
·
If the results between
60% to 70%, 40% of the retained amount would be released.
·
If it is 70% to 80%,
50% of the retained amount would be released.
·
If it is 80% to 90%,
60% of the retained amount would be released.
·
If results were more
than 90%, full balance amount would be released.
6.
Other decisions:
i)
An additional special
coaching centre would be opened at Amarpur. For this, SDM Amarpur may send the
proposal to Tribal Welfare Depart by June, 2005.
ii)
All Special Coaching
Centres should be functional by June, 2005. Priority should be given to those
areas where the performance is poor.
iii)
SDMs shall list out
availability of khas land for allotment to the eligible ST families for rubber
plantation.
iv)
Proposal for
constitution of Sub-Divisional Committee and Boarding Housing Committee for ST
hostel shall be sent by the respective SDM.
v)
An Inspection Book
shall be maintained in all the ST hostels. The visiting officials in the
inspection book shall make entries. It shall be ensured that either SDM or
SDTWO visits each hostel at least once in a month.
vi)
NGOs run hostels should
also be visited by SDMs and SDTWOs.
vii) While sending fresh proposals, SDM concerned shall
personally verify the living conditions of the hostel inmates.
viii)
One officer should be
assigned the responsibility of interacting with the returnee.
ix) Allocation of IAY Houses to the surrendered
extremists/returnees shall be done by RD Department. For this purpose a
small percentage of IAY house, allotted to the District, may be kept reserved.
x)
SDM, Udaipur shall
send details of the restoration cases, as per the proforma circulated by the
State Government. This information
should be sent within seven days as District level information could not be
compiled in absence of information of Udaipur Sub-division.
xi)
Merit award for the
schools other than Madhyamik and Higher Secondary School should be completed in
the month of June by each Sub-Division.
xii) Proposal shall be submitted for Tribal Rest House at
Natunbazar, Ompi, Belonia and Udaipur. Respective SDMs may submit the formal
proposal to Tribal Welfare Department at the earliest.
Meeting ended with thanks to all.
(Y. Kumar)
District Magistrate & Collector
South Tripura